Day 48, 49 and 50: adjusting to life in a construction zone with the in-laws

Thursday, May 28, 2009

Four adults, one child and three dogs.  Under one roof.  In a house that is a still a construction zone.  In a perfect world, the work would have been done by now.  Alas, a perfect world this is not. On Monday, we were still recovering from the 11-hour road trip.  I headed out to the [...]

Days 46 and 47: Work continues while we are away

On Thursday and Friday, the contractors continued working on our house while we were hundreds of miles away visiting my wife’s family.  We returned home Sunday night to find that the tile in the kitchen and in the hallway had indeed been laid while we were gone.  Sunday marked the first night of a two [...]

Day 45: Moving day

Tuesday, May 26, 2009

This may be a little confusing because I have only been counting the days that the contractors have worked on this project.  However, with the kitchen renovation, there has also been a cabinet maker toiling away in his shop for a couple of weeks.  I did not count the days he spent installing the lower [...]

Day 44: Second floor 95% finished.

Monday, May 18, 2009

Friday was the contractors’ 44th day working on our house.  The second floor bedrooms, except for a bit of trim in one closet, are finished.  It is finally possible to start moving things upstairs, and we will be calling a mover to get some of the large items out of storage. On Saturday, my wife, [...]

Days 41, 42, 43: Work on the second floor continues

Friday, May 15, 2009

A lot has been accomplished in a short amount of time on the second floor.  On Tuesday, Wednesday and Thursday, the three contractors fixed up the drywall (mud and primer), laid the bamboo floor, hung doors, installed trim and finished painting one of the rooms.  Was all of this work within my abilities as a [...]