Part of the architect’s design involved the main entrance for the laundry room being off of the back landing. To accomplish this, a hole needed to be punched in the wall, and part of the laundry room floor needed to be cut out to accomodate steps. The contractors cut out the opening in the wall, [...]
Day 8: Replacing Structure
Monday March 23: After two days of destruction, not to mention the six years of my own de-construction, the house is finally being put back together. Not only have the massive mistakes by the previous owner been erased (at least in this area of the house), but the structure is better and stronger than it [...]
