In what is becoming a yearly tradition, our driveway is once again graced with the presence of a rubbish bin. Now I can easily get rid of the piles of debris in the basement and finish ripping up the tile and hardwood in the old ensuite– basically finishing the work I did last summer. My ambition at this point is to have the bin hauled away by Friday, which is the same day I am hoping to get the ball rolling on the heating upgrade. Today, I loaded about 8 large railway ties into the bin. The ties were used as a raised garden bed in front of the old wood front porch. I still have the rest of the cast concrete porch to get rid of, as well as some other debris, but I should be able to call in a masonry specialist next week to repair and re-point any damages to the brick or block.
The bin is back
Tuesday, 29 May 07
Comments
There are no comments on this entry.
Comments for this entry are now closed.
